Dharwad

Industrial Land in Kotoor-Belur Region

North Karnataka’s Emerging Hub for Electronics (EMC 2.0), E-Mobility & Heavy Engineering

Strategic Connectivity

Land & Infrastructure Specs

Financial Incentives (Karnataka Industrial Policy & EMC Scheme)

Ideal Industry Fit

Kotoor-Belur at a glance

Key facts for Kotoor-Belur industrial area
National highway1 km from NH-48 (Bengaluru–Mumbai Expressway)
AirportHubballi Domestic — approximately 33 km
RailDharwad Railway Station, South Western Railway
PortsKarwar 170 km; Goa 180 km
Special cluster224.5-acre Electronics Manufacturing Cluster (EMC 2.0), MeitY-backed
EMC facilitiesPlug-and-play factory sheds and advanced testing facilities
Water1,940 KLD from the Malaprabha River; CETP recycling
Power32,000 KVA allocation via GESCOM/KPTCL
Incentive zoneZone-1/Zone-2 plus central EMC 2.0 assistance
Plot availabilityConfirmed on enquiry

Distances and figures are approximate and taken from published project information. Verify current details before making a commercial decision.

Frequently asked questions about Kotoor-Belur

What is the EMC 2.0 cluster at Kotoor-Belur?
A newly approved 224.5-acre Electronics Manufacturing Cluster backed by the central Ministry of Electronics and Information Technology. It provides plug-and-play factory sheds and advanced testing facilities, so an electronics unit can begin operations without building specialised infrastructure first.
How far is Kotoor-Belur from NH-48 and Hubballi airport?
The area sits just 1 km from NH-48, the Bengaluru–Mumbai Expressway, giving seamless north-south freight movement. Hubballi Domestic Airport is approximately 33 km away for corporate transit and high-value cargo.
What incentives apply to electronics units here?
Two layers stack. The area falls in Karnataka’s Zone-1/Zone-2, carrying the highest state incentives, including capital and machinery subsidies, 100% stamp duty exemption and multi-year property tax exemption. Electronics and semiconductor units additionally qualify for central EMC 2.0 assistance.
What water and power are allocated?
Water is assured at 1,940 KLD drawn from the Malaprabha River, supported by CETP recycling infrastructure. Power is a dedicated high-capacity grid with 32,000 KVA allocated, managed by GESCOM and KPTCL.
Which ports serve Kotoor-Belur?
Karwar at 170 km and Goa at 180 km are the nearest major western ports. For electronics exporters shipping to Europe or the Middle East, routing west through these avoids the longer haul to the eastern coast.

Our Properties

Interested in this property?

Connect with our team for plot availability, pricing, and govt/private allotment guidance.

Request Information

Explore other industrial areas

Kolar District

Premium govt/private Land for Manufacturing, Electronics & Logistics

The Flagship Hub of the Bengaluru-Mumbai Industrial Corridor (BMIC)

North Karnataka’s Emerging Hub for Electronics (EMC 2.0), E-Mobility & Heavy Engineering

Check if Kotoor-Belur fits your requirement

Tell us the land area, intended use and power load you need. We check it against what is currently available at Kotoor-Belur and comparable areas on the same corridor, and come back with parcels that actually match — plus the documentation position and an indicative rate with its as-of date.

No obligation. Your details are used only to respond to this enquiry.